Tesla’s solar rooftop array at Gigafactory 1 is starting to take shape

Discussion in 'Tesla Energy' started by simonalvarez0987, Mar 12, 2018.

  1. simonalvarez0987

    simonalvarez0987 Active Member

    Joined:
    Dec 21, 2017
    Messages:
    612
    #1 simonalvarez0987, Mar 12, 2018
    Last edited by a moderator: Apr 18, 2018
    [​IMG]

    [​IMG]

    Recent aerial photographs obtained by Teslarati show that Tesla’s installation of its rooftop solar array for Gigafactory 1 outside of Reno, Nevada is progressing well. As could be seen in the images, which were taken on March 12, 2018, the California-based electric car and energy company has installed six sets of solar panels on the north end of the facility so far.

    Gigafactory 1 was designed with sustainability in mind. Tesla’s description of the sprawling facility alone states that the factory is set to be powered exclusively by renewable energy sources, including a massive solar array that would be installed on its roof. In Tesla’s handout for an investor event, the Elon Musk-led firm described its plans of installing the largest rooftop solar array in the world and the system’s impressive specs. As the facility started taking form, however, the Nevada Gigafactory’s solar panels have proven elusive.

    Leaked images of the first set of solar panels in Gigafactory 1’s roof were released by Building Tesla late last month. The publication, which tracks the progress of Tesla’s structures over time, was able to get a snapshot of the rooftop solar array on February 21, 2018. During that time, only one set of solar panels were completed, and another one was being installed.

    If Teslarati’s aerial photos are any indication, it seems like Tesla was able to install almost five more sets of solar panels over the last couple of weeks. Here are the photos we obtained of Gigafactory 1.

    [​IMG]An aerial shot of Tesla’s Gigafactory 1 outside Reno, Nevada, taken during a flyover on March 12, 2018. [Credit: Teslarati][​IMG]An aerial shot of Tesla’s Gigafactory 1 outside Reno, Nevada, taken during a flyover on March 12, 2018. [Credit: Teslarati][​IMG]An aerial shot of Tesla’s Gigafactory 1 outside Reno, Nevada, taken during a flyover on March 12, 2018. [Credit: Teslarati][​IMG]An aerial shot of Tesla’s Gigafactory 1 outside Reno, Nevada, taken during a flyover on March 12, 2018. [Credit: Teslarati][​IMG]An aerial shot of Gigafactory 1 outside Reno, Nevada, taken during a flyover on March 12, 2018 and showing Tesla’s ongoing construction of a rooftop solar array. [Credit: Teslarati]

    Now estimated to cost more than $1.3 billion in construction costs, the Nevada Gigafactory is still only a fraction of its planned size. Nevertheless, it is heartening to see that Tesla is starting the construction of the Nevada Gigafactory’s photovoltaic system. It does, after all, fit in well with the company’s current strategy of growing from within and optimizing its existing facilities before expanding its physical footprint.

    As we noted in a previous report, Gigafactory 1’s footprint has been the same since August 2017. Reports from Buildzoom, however, reveal that the facility has seen a flurry of activity last year, with the Elon Musk-led firm filing 112 new building permits for Gigafactory 1 in 2017. The improvements, which cost Tesla another 379.9 million, included 50 addendums - enhancements for facilities already in operation - including upgrades for its microgrid laboratory, chiller yard, and general improvements in Sections F and G. A permit for a metrology lab, which would ensure that components are manufactured according to specifications, was also filed.

    Currently, the Nevada Gigafactory, which is tasked with the production of the Model 3’s battery packs and drivetrain, boasts a footprint of 1.9 million square feet, with 4.9 million square feet of operational space across several floors. While the now-$1.3-billion facility is already impressive, however, Gigafactory 1 is still only 30 percent complete. Once finished, it is expected to cover an area of 13 million square feet and boast a battery production capacity of 35 GWh annually, making it the largest building in the world by physical footprint.

    Article: Tesla’s solar rooftop array at Gigafactory 1 is starting to take shape
     
    • Like Like x 1
  2. robbyhoffmann

    robbyhoffmann New Member

    Joined:
    Feb 13, 2018
    Messages:
    1
  3. vdiv

    vdiv Member

    Joined:
    Dec 15, 2016
    Messages:
    75
    Guess that microgrid lab needed some "microgridy" photovoltaics :D Bob Marley is suddenly singing "Sun is Shining" :)

    Wonder if now other Tesla facilities will get panels as well, the Fremont and Buffalo factories, new office buildings, service centers, and Superchargers.
     
    • Like Like x 1
  4. Roy_H

    Roy_H Member

    Joined:
    Jan 12, 2018
    Messages:
    94
    Location:
    Ontario, Canada
    #4 Roy_H, Mar 13, 2018
    Last edited: Mar 13, 2018
    I am confused by a few details. The footprint, going by the photos here covers most of the property, with available expansion to the south by about half the width of the building or 1 more section. I refer to the building as being 2 "sections" wide (east-west) and about 7 sections long (north-south). This shows about 9 sections currently built, and for about 5 more on the north-west to make the building ultimately 10x2 = 20 sections. I think these estimates would indicate it is now 45% built, not 30%. The article also says the ultimate size is 13 million sq ft while current size is 1.9 Msqft. I think there is a mix up in "area covered" and floor space. At least I think "area covered" would be land area, not floor area.

    Also it looks like the solar panels are arranged in rows north-south instead of the normal east-west. East-west orientation allows the panels to be tilted south without shading the next row.
     
  5. sjoerd.jump

    sjoerd.jump New Member

    Joined:
    Dec 6, 2017
    Messages:
    2
  6. Roy_H

    Roy_H Member

    Joined:
    Jan 12, 2018
    Messages:
    94
    Location:
    Ontario, Canada
    I should have followed the "investor handout" link. It shows that the final version is wider than I thought, 3 sections wide not 2, and also a little longer.
     